lemon-mirror:
Home >> American Motors >> 1980 >> AMX Automatic Trans >> Labor Times >> Engine Mechanical >> Mechanical >> Valve >> Grind Complete

Grind Complete

Includes: Remove carbon, check surfaces for warpage, reface or replace Valves, resurface Valve Seats and clean Valve Guides. Adjust Valves (where applicable).

Applies ToNoteStandard HoursWarranty HoursSkill Level
In-Line66.4A
Additional Procedure: VALVE: Grind Complete:
In-Line6, Where Air Cond interferes add0.30.3A
In-Line6, Where Air Pump interferes add0.20.2A
In-Line6, Where Pwr Strg interferes add0.40.4A
Combination Procedure: ROCKER ARM ASSEMBLY: Disassemble & Assemble:
Includes: Clean and replace necessary components only.
In-Line60.5B
Combination Procedure: VALVE SPRING ASSEMBLED HEIGHT: Correct:
Per 3 Springs0.2A