Removal & Installation: Generator: Installation
- Position generator near wiring harness connector and battery positive lead.
- Connect battery positive lead to generator and install the generator output BAT terminal nut. Tighten nut to specifications. See TORQUE SPECIFICATIONS . Tighten the generator output BAT terminal nut to 111 inch. lbs. (12.5 N.m).
- Press protective boot on to generator output BAT terminal.
- Connect wiring harness connector to generator.
- Position generator to mounting features on engine.
- Install generator mounting bolt. Tighten generator mounting bolts to 26 ft. lbs (35 N.m).
- Install drive belt tensioner.
- Install intake air resonator.
- Connect battery negative cable.