lemon-mirror:
Home >> Cadillac >> 2009 >> Escalade EXT >> Labor Times >> Engine Mechanical >> Mechanical >> Engine Assembly >> Remove, Install, and Overhaul

Engine Assembly: Remove, Install, and Overhaul

Includes: Replace Rings, Main and Rod Bearings, Camshaft(s), Crankshaft and Timing Components. Remove Cylinder ridge, burnish Cylinders, grind Valves and clean and test or replace Lifters. Includes (where applicable): Adjust Valves. DOES NOT include Pin fit or rebore and align Rods. See machine operations.

Applies ToNoteStandard HoursWarranty HoursSkill Level
35.2A
Additional Procedure: ENGINE ASSEMBLY: Remove, Install, and Overhaul:
w/Skid Plate add0.3A
Combination Procedure: CAMSHAFT BEARING: Remove & Replace:
Each0.3A
Combination Procedure: OIL PUMP: Overhaul:
0.6B
Combination Procedure: VALVE GUIDE: Remove & Replace:
Each0.2A