lemon-mirror:
Home >> Chevrolet >> 2000 >> Tracker 2D Utility, 1.6 6, 4WD >> Labor Times >> Engine Mechanical >> Mechanical >> Valve >> Grind Complete

Grind Complete

Includes: Remove carbon, check surfaces for warpage, reface or replace Valves, resurface Valve Seats and clean Valve Guides. Adjust Valves (where applicable).

Applies ToNoteStandard HoursWarranty HoursSkill Level
In-Line4,1.6L Eng10.3A
Additional Procedure: VALVE: Grind Complete:
In-Line4,1.6L Eng, Where Air Cond interferes add1.0A
Combination Procedure: ROCKER ARM ASSEMBLY: Disassemble & Assemble:
Includes: Clean and replace necessary components only.
1.6L Eng, Each0.4B
Combination Procedure: VALVE LIFTERS: Remove & Replace:
All0.1B
Combination Procedure: VALVE LIFTERS (REMOVED): Clean:
Each Additional0.1B
One0.2B