lemon-mirror:
Home >> Chevrolet >> 2003 >> Cutaway 4.8 V >> Labor Times >> Engine Mechanical >> Mechanical >> Engine Assembly >> Remove, Install, and Overhaul

Engine Assembly: Remove, Install, and Overhaul

Includes: Replace Rings, Main and Rod Bearings, Camshaft(s), Crankshaft and Timing Components. Remove Cylinder ridge, burnish Cylinders, grind Valves and clean and test or replace Lifters. Includes (where applicable): Adjust Valves. DOES NOT include Pin fit or rebore and align Rods. See machine operations.

Applies ToNoteStandard HoursWarranty HoursSkill Level
V8, w/Dual AlternatorsIncludes: Recover, Evacuate and Recharge Air Conditioning System.36.9A
V8, w/o Dual AlternatorsIncludes: Recover, Evacuate and Recharge Air Conditioning System.36.4A
Combination Procedure: VALVE GUIDE: Remove & Replace:
Each0.2A