lemon-mirror:
Home >> Chevrolet >> 2019 >> Blazer L >> Labor Times >> Engine Mechanical >> Mechanical >> Valve >> Grind Complete

Grind Complete

Includes: Remove carbon, check surfaces for warpage, reface or replace Valves, resurface Valve Seats and clean Valve Guides. Adjust Valves (where applicable).

Applies ToNoteStandard HoursWarranty HoursSkill Level
2.5L Eng16.5A
Combination Procedure: AIR INTAKE SYSTEM: Reset:
Intake System Learned Values ResetIncludes: Additional time for use of scan tool to perform this procedure.0.2B
Combination Procedure: ENGINE OR TRANSMISSION MOUNT: Balance:
Powertrain Mount Balancing0.5D
Combination Procedure: THROTTLE BODY ASSEMBLY: Reset:
Throttle Body Idle Air Flow Compensation ResetIncludes: Additional time for use of scan tool to perform this procedure.0.2B
Combination Procedure: VALVE LIFTERS (REMOVED): Clean:
Each Additional0.1B
One0.2B