Grind Complete
WARNING: This page is about the Trailblazer L, which is a different variant/trim than selected.
Includes: Remove carbon, check surfaces for warpage, reface or replace Valves, resurface Valve Seats and clean Valve Guides. Adjust Valves (where applicable).| Applies To | Note | Standard Hours | Warranty Hours | Skill Level |
|---|---|---|---|---|
| 1.2L Eng | Includes: R&I Subframe Assembly. Includes: R&I Engine and Transmission Assembly. Includes: R&I Camshaft Cover w/Turbocharger together as an assembly. Includes: R&I Fuel Rail. Includes: R&I Fuel Injectors. Includes: R&I Camshafts. Includes: Drain and refill Cooling System. Includes: Drain and refill Transmission Fluid. Includes: Confirm Fluid temperature for level check. Includes: Drain and refill Engine Oil. Includes: Reset Oil Life Monitor. DOES NOT include Air Conditioning System recover, evacuate and recharge. DOES NOT include wheel alignment. | 19.1 | A | |
| Combination Procedure: AIR INTAKE SYSTEM: Reset: | ||||
| 1.2L Eng, Intake System Learned Values Reset | Includes: Additional time for use of scan tool to perform this procedure. | 0.2 | B | |
| Combination Procedure: VALVE LIFTERS (REMOVED): Clean: | ||||
| Each Additional | 0.1 | B | ||
| One | 0.2 | B | ||