lemon-mirror:
Home >> Dodge and Ram >> 1981 >> Cutaway >> Labor Times >> Engine Mechanical >> Mechanical >> Valve >> Grind Complete

Grind Complete

Includes: Remove carbon, check surfaces for warpage, reface or replace Valves, resurface Valve Seats and clean Valve Guides. Adjust Valves (where applicable).

Applies ToNoteStandard HoursWarranty HoursSkill Level
V8,5.9L Eng, Both Heads10.8A
Additional Procedure: VALVE: Grind Complete:
V8, Where Air Pump interferes add0.60.6A
w/100 Amp Alternator add0.6A
Where Air Cond interferes add0.20.2A
Where Power Steering interferes add0.2A
Combination Procedure: ROCKER ARM ASSEMBLY: Overhaul:
Double Rocker,Both1.5B
Double Rocker,One0.8B
Single Rocker,One0.5B
Single Rocker,Two0.9B