lemon-mirror:
Home >> Fiat >> 2012 >> 500c Lounge >> Labor Times >> Engine Mechanical >> Mechanical >> Valve >> Grind Complete

Grind Complete

Includes: Remove carbon, check surfaces for warpage, reface or replace Valves, resurface Valve Seats and clean Valve Guides. Adjust Valves (where applicable).

Applies ToNoteStandard HoursWarranty HoursSkill Level
DOES NOT include Air Conditioning System recover, evacuate and recharge.13.3A
Combination Procedure: AIR CONDITIONING SYSTEM: Complete Charge:
Includes: Air Conditioning system recover, evacuate and recharge.
w/R-1234yf RefrigerantIncludes: Perform Safety Pressurized Pre-Charge Leak Test.1.4B
w/R-134a Refrigerant1.2B