Grind Complete
WARNING: This page is about the Canyon AT4, which is a different variant/trim than selected.
Includes: Remove carbon, check surfaces for warpage, reface or replace Valves, resurface Valve Seats and clean Valve Guides. Adjust Valves (where applicable).| Applies To | Note | Standard Hours | Warranty Hours | Skill Level |
|---|---|---|---|---|
| 2.7L Eng | Includes: R&I Fender Liner. Includes: R&I Starter Assembly. Includes: R&I Catalytic Converter. Includes: R&I Turbocharger. Includes: R&I Intake Manifold. Includes: R&I Fuel Rail. Includes: R&I Coolant Flow Control Valve. Includes: R&I Timing Chain. Includes: R&I Ignition Coils. Includes: R&I Valve Cover. Includes: Drain and refill Cooling System. Includes: Drain and refill Engine Oil. Includes: Reset Oil Life Monitor. | 23.5 | A |