lemon-mirror:
Home >> Geo >> 1990 >> Metro XFi >> Labor Times >> Other Variant >> Electrical >> Starter >> Starter Assembly >> Remove, Install, and Overhaul

Starter Assembly: Remove, Install, and Overhaul

WARNING: This page is about the Metro Base, 2D Hatchback, Automatic, which is a different variant/trim than selected.
Includes: Turn Commutator, test Armature and Fields, replace Brushes, Bearings and Solenoid (where applicable).

Applies ToNoteStandard HoursWarranty HoursSkill Level
1.0L Eng,Automatic Trans1.9B
Combination Procedure: FIELD COILS: Remove & Replace:
0.3B