lemon-mirror:
Home >> Geo >> 1993 >> Metro LSi, 2D Hatchback, Standard >> Labor Times >> Other Variant >> Electrical >> Starter >> Battery >> Testing

Labor Times: Other Variant: Electrical: Starter: Battery: Testing

WARNING: This page is about the Metro Base, 2D Hatchback, Automatic, which is a different variant/trim than selected.
Includes: Hydrometer and load test. DOES NOT include electrical system test.

Applies ToNoteStandard HoursWarranty HoursSkill Level
0.3C