lemon-mirror:
Home >> Geo >> 1995 >> Prizm Base, Automatic >> Labor Times >> Engine Mechanical >> Mechanical >> Engine Assembly >> Remove, Install, and Overhaul

Engine Assembly: Remove, Install, and Overhaul

Includes: Replace Rings, Main and Rod Bearings, Camshaft(s), Crankshaft and Timing Components. Remove Cylinder ridge, burnish Cylinders, grind Valves and clean and test or replace Lifters. Includes (where applicable): Adjust Valves. DOES NOT include Pin fit or rebore and align Rods. See machine operations.

Applies ToNoteStandard HoursWarranty HoursSkill Level
Eng VIN 625.0A
Additional Procedure: ENGINE ASSEMBLY: Remove, Install, and Overhaul:
w/Automatic Trans add0.4A
Where Air Cond interferes add0.3A
Where Pwr Strg Interferes add0.3A