lemon-mirror:
Home >> Geo >> 1997 >> Metro Base >> Labor Times >> Electrical >> Starter >> Starter Assembly >> Remove, Install, and Overhaul

Starter Assembly: Remove, Install, and Overhaul

Includes: Turn Commutator, test Armature and Fields, replace Brushes, Bearings and Solenoid (where applicable).

Applies ToNoteStandard HoursWarranty HoursSkill Level
1.0L Eng,Standard Trans1.7B
Combination Procedure: FIELD COILS: Remove & Replace:
0.3B