Description & Operation
Power is supplied at all times:
- Through 50-Amp fusible link (Letter "G", located in fuse, fusible link and relay box)
- To ignition switch terminal No. 1
With ignition switch in START position, power is supplied:
- From ignition switch terminal No. 4
- To Park/Neutral Position relay terminal No. 7
Ground is supplied with selector lever in "P" or "N" position:
- To TCM terminal No. 48 through Park/Neutral Position relay terminals No. 1 and 2
- From body grounds E24 and E44
Then park/neutral position switch is energized and power is supplied:
- From Park/Neutral Position relay terminal No. 6
- To starter motor harness connector terminal No. 1