lemon-mirror:
Home >> Jeep >> 1979 >> Wagoneer Base >> Labor Times >> Engine Mechanical >> Mechanical >> Valve >> Grind Complete

Grind Complete

Includes: Remove carbon, check surfaces for warpage, reface or replace Valves, resurface Valve Seats and clean Valve Guides. Adjust Valves (where applicable).

Applies ToNoteStandard HoursWarranty HoursSkill Level
V8, Both Heads9.7A
Additional Procedure: VALVE: Grind Complete:
V8, Where Power Steering interferes add0.30.3A
Where Air Cond interferes add0.6A