Grind Complete
Includes: Remove carbon, check surfaces for warpage, reface or replace Valves, resurface Valve Seats and clean Valve Guides. Adjust Valves (where applicable).| Applies To | Note | Standard Hours | Warranty Hours | Skill Level |
|---|---|---|---|---|
| 2.0L Eng, w/Air Cond | 8.3 | 5.7 | A | |
| 2.0L Eng, w/o Air Cond | 7.8 | 5.5 | A |