lemon-mirror:
Home >> Mazda >> 1981 >> GLC Base >> Labor Times >> Engine Mechanical >> Mechanical >> Engine Assembly >> Remove, Install, and Overhaul

Engine Assembly: Remove, Install, and Overhaul

PISTON ENGINE

Includes: Replace Rings, Main and Rod Bearings, Camshaft(s), Crankshaft and Timing Components. Remove Cylinder ridge, burnish Cylinders, grind Valves and clean and test or replace Lifters. Includes (where applicable): Adjust Valves. DOES NOT include Pin fit or rebore and align Rods. See machine operations.

Applies ToNoteStandard HoursWarranty HoursSkill Level
Standard Trans19.7A
Additional Procedure: ENGINE ASSEMBLY: Remove, Install, and Overhaul:
In-Line4, Where Air Cond interferes add0.7A
In-Line4, Where Pwr Strg interferes add0.3A