Grind Complete
Includes: Remove carbon, check surfaces for warpage, reface or replace Valves, resurface Valve Seats and clean Valve Guides. Adjust Valves (where applicable).| Applies To | Note | Standard Hours | Warranty Hours | Skill Level |
|---|---|---|---|---|
| 3.0L Eng,O.H.C.- SOHC, Both Heads,w/Front Catalytic Converter | 12.2 | A | ||
| 3.0L Eng,O.H.C.- SOHC, Both Heads,w/o Front Catalytic Converter | 11.7 | A |