lemon-mirror:
Home >> Nissan-Datsun >> 1997 >> Sentra Base >> Labor Times >> Transmission >> Manual Trans >> Transmission Assembly >> Remove, Install, and Overhaul

Transmission Assembly: Remove, Install, and Overhaul

Includes: R&I Transaxle Assembly, inspect and replace necessary Transmission components and road test.

Applies ToNoteStandard HoursWarranty HoursSkill Level
7.7A
Additional Procedure: TRANSMISSION ASSEMBLY: Remove, Install, and Overhaul:
Where Air Cond interferes add0.9A
Where Pwr Strg interferes add0.4A
Combination Procedure: CLUTCH PILOT BEARING OR BUSHING: Remove & Replace:
0.5C
Combination Procedure: CLUTCH PRESSURE PLATE: Remove & Replace:
0.3C
Combination Procedure: CLUTCH RELEASE BEARING: Remove & Replace:
0.2C
Combination Procedure: FLYWHEEL: Remove & Replace:
0.5C