lemon-mirror
:
Home
>>
Nissan-Datsun
>>
2011
>>
Quest LE
>>
Repair and Diagnosis
>>
Engine Performance
>>
System
>>
Engine Control System - Component Testing
>>
Periodic Maintenance
>>
Ignition Timing
>>
Work Procedure
Work Procedure
CHECK IGNITION TIMING
Attach timing light to loop wires as shown in the figure below.
Timing light (A)
<=: Vehicle front
Fig 1: Identifying Timing Light
Courtesy of NISSAN MOTOR CO., U.S.A.
Check ignition timing.
INSPECTION END
Fig 2: Identifying Timing Indicator
Courtesy of NISSAN MOTOR CO., U.S.A.