Grind Complete
WARNING: This page is about the Colt Base, which is a different variant/trim than selected.
Includes: Remove carbon, check surfaces for warpage, reface or replace Valves, resurface Valve Seats and clean Valve Guides. Adjust Valves (where applicable).| Applies To | Note | Standard Hours | Warranty Hours | Skill Level |
|---|---|---|---|---|
| 1.5L Eng,O.H.C.- SOHC, w/Air Cond | 8.1 | A | ||
| 1.5L Eng,O.H.C.- SOHC, w/o Air Cond | 7.9 | A | ||
| Additional Procedure: VALVE: Grind Complete: | ||||
| Where Pwr Strg Interferes add | 0.2 | 0.2 | A | |
| Combination Procedure: ROCKER ARM ASSEMBLY: Disassemble & Assemble: | ||||
| In-Line4, Both | 0.7 | B | ||
| In-Line4, One Shaft | 0.5 | B | ||
| Combination Procedure: VALVE SPRING ASSEMBLED HEIGHT: Correct: | ||||
| Per 3 Springs | 0.2 | A | ||