lemon-mirror:
Home >> Pontiac >> 1983 >> 2000 Sunbird Automatic >> Labor Times >> Engine Mechanical >> Mechanical >> Valve >> Grind Complete

Grind Complete

Includes: Remove carbon, check surfaces for warpage, reface or replace Valves, resurface Valve Seats and clean Valve Guides. Adjust Valves (where applicable).

Applies ToNoteStandard HoursWarranty HoursSkill Level
1.8L Eng,Normally Aspirated6.85.2A
Additional Procedure: VALVE: Grind Complete:
Where Air Cond interferes add0.9A
Where Cruise Control interferes add0.2A
Where Elect Eng System interferes add0.5A
Combination Procedure: ROCKER ARM ASSEMBLY: Disassemble & Assemble:
Both0.6B
One0.3B
Combination Procedure: ROCKER ARM STUD: Remove & Replace:
Each Additional,Press in Type0.2B
Each Additional,Screw in Type0.1B
One,Press in Type0.3B
One,Screw in Type0.2B
Combination Procedure: VALVE LIFTERS: Remove & Replace:
In-Line40.4B
Combination Procedure: VALVE LIFTERS (REMOVED): Clean:
Each Additional0.1B
One0.2B
Combination Procedure: VALVE SPRING ASSEMBLED HEIGHT: Correct:
Per 3 Springs0.2A