lemon-mirror:
Home >> Subaru >> 1985 >> Brat Automatic >> Labor Times >> Engine Mechanical >> Mechanical >> Valve >> Grind Complete

Grind Complete

Includes: R&I Engine Assembly (where noted). Remove carbon, check surfaces for warpage, reface or replace Valves, resurface Valve Seats, clean Valve Guides, adjust Valves.

Applies ToNoteStandard HoursWarranty HoursSkill Level
O.H.C.- SOHC,Turbocharger, Both11.3A
O.H.V., Both6.8A
Additional Procedure: VALVE: Grind Complete:
Refer to Additional Times following Cylinder Head Gasket - R&R.A
Combination Procedure: CYLINDER HEAD STUD: Remove & Replace:
Each0.1B
Combination Procedure: VALVE GUIDE: Remove & Replace:
Each Additional0.2A
One0.3A