Oil Charge Pipe: Installation
- Install the oil charge pipe.NOTE: Use new bolts and O-rings.
Tightening torque:
38 N.m (3.9 kgf-m, 28.0 ft-lb)
- Install the turbine speed sensor 1 and harness, and then connect the connector.
Tightening torque:
7 N.m (0.7 kgf-m, 5.2 ft-lb)
- Install the front exhaust pipe. < Ref. to INSTALLATION , Front Exhaust Pipe. >
- Install the under cover.
- Lower the vehicle.
- Connect the battery ground terminal.