lemon-mirror:
Home >> Suzuki >> 1990 >> Sidekick JS >> Labor Times >> Other Variant >> Transmission >> Manual Trans >> Transmission Assembly >> Remove, Install, and Overhaul

Transmission Assembly: Remove, Install, and Overhaul

WARNING: This page is about the Sidekick JLX, which is a different variant/trim than selected.
Applies ToNoteStandard HoursWarranty HoursSkill Level
4WD10.2A
Combination Procedure: CLUTCH PILOT BEARING: Remove & Replace:
0.8C
Combination Procedure: CLUTCH PRESSURE PLATE &/OR DISC: Remove & Replace:
0.5C
Combination Procedure: CLUTCH RELEASE BEARING: Remove & Replace:
0.2C
Combination Procedure: FLYWHEEL: Remove & Replace:
0.7C