lemon-mirror:
Home >> Suzuki >> 2006 >> Verona Base >> Repair and Diagnosis >> Engine Performance >> System >> Engine Electrical Devices >> Repair Instructions >> VIS Vacuum Tank Installation

VIS Vacuum Tank Installation

  1. Installation should follow the removal procedure in the reverse order.
  2. Install the VIS vacuum tank.

    Tighten: 

    Tighten the VIS vacuum tank retaining bolts to 7 - 9 N.m (62 - 80 lb-in.).

    Fig 1: Identifying VIS Vacuum Tank And Retaining Bolts
    G04718821Courtesy of SUZUKI OF AMERICA CORP.