Grind Complete
WARNING: This page is about the Pickup Base, 22-RE, which is a different variant/trim than selected.
Includes: Remove carbon, check surfaces for warpage, reface or replace Valves, resurface Valve Seats and clean Valve Guides. Adjust Valves (where applicable).| Applies To | Note | Standard Hours | Warranty Hours | Skill Level |
|---|---|---|---|---|
| In-Line4,Gas, Manual Strg,w/o Fuel Injection | 7.6 | A | ||
| In-Line4,Gas, Power Strg,w/o Fuel Injection | 8.2 | A | ||
| Normally Aspirated,Gas, Manual Strg,w/Fuel Injection | 8.5 | A | ||
| Normally Aspirated,Gas, Power Strg,w/Fuel Injection | 9.0 | A | ||
| Additional Procedure: VALVE: Grind Complete: | ||||
| Where Air Cond interferes add | 0.5 | A | ||
| Combination Procedure: ROCKER ARM BUSHINGS: Remove & Replace: | ||||
| 1.7 | B | |||
| Combination Procedure: VALVE GUIDE: Remove & Replace: | ||||
| Each | 0.1 | A | ||
| Combination Procedure: VALVE LASH ADJUSTER: Remove & Replace: | ||||
| Valve Adjusting Screw | 0.3 | B | ||