lemon-mirror:
Home >> Volkswagen >> 1985 >> Vanagon Base, Automatic >> Labor Times >> Engine Mechanical >> Mechanical >> Valve >> Grind Complete

Grind Complete

Includes: R&I Camshaft and both Manifolds (where necessary), remove carbon, check surfaces for warpage, reface or replace Valves, resurface Valve Seats, clean Valve Guides, and adjust Valves.

Applies ToNoteStandard HoursWarranty HoursSkill Level
w/Air Cond,BothIncludes: R&I Air Conditioning Compressor; recover, evacuate and recharge Air Conditioning System.11.8A
w/Air Cond,One SideIncludes: R&I Air Conditioning Compressor; recover, evacuate and recharge Air Conditioning System.9.0A
w/o Air Cond,Both11.0A
w/o Air Cond,One Side8.2A
Combination Procedure: VALVE GUIDE: Remove & Replace:
All0.6A
One0.3A