Grind Complete
WARNING: This page is about the Vanagon Base, Automatic, which is a different variant/trim than selected.
Includes: R&I Camshaft and both Manifolds (where necessary), remove carbon, check surfaces for warpage, reface or replace Valves, resurface Valve Seats, clean Valve Guides, and adjust Valves.| Applies To | Note | Standard Hours | Warranty Hours | Skill Level |
|---|---|---|---|---|
| w/Air Cond,Both | Includes: R&I Air Conditioning Compressor; recover, evacuate and recharge Air Conditioning System. | 11.8 | A | |
| w/Air Cond,One Side | Includes: R&I Air Conditioning Compressor; recover, evacuate and recharge Air Conditioning System. | 9.0 | A | |
| w/o Air Cond,Both | 11.0 | A | ||
| w/o Air Cond,One Side | 8.2 | A | ||
| Combination Procedure: VALVE GUIDE: Remove & Replace: | ||||
| All | 0.6 | A | ||
| One | 0.3 | A | ||