lemon-mirror:
Home >> BMW >> 2007 >> X3 Automatic >> Repair and Diagnosis >> Body & Frame >> Towing Systems >> Trailers - Repair >> 10 Loading Platform >> 86 10 ... Installation Position Of BMW Lettering

86 10 ... Installation Position Of BMW Lettering

Top edge of lettering at same height as recess for position light (1).

Distance between drawbar member and lettering (2) is 300 mm.

Installation: 

Remove grease from gluing surfaces.

Fig 1: Identifying Distance Between Drawbar Member & Lettering
G04786654Courtesy of BMW OF NORTH AMERICA, INC.