Charge Port Housing Replacement
| Callout | Component Name |
|---|---|
|
WARNING:
Always perform the High Voltage Disabling procedure prior to servicing any High Voltage component or connection. Personal Protection Equipment (PPE) and proper procedures must be followed. The High Voltage Disabling procedure includes the following steps:
Before working on any high voltage system, be sure to wear the following Personal Protection Equipment:
Failure to follow the procedures may result in serious injury or death. Preliminary Procedures
|
|
| 1 | Charge Port Lower Housing Retainer Procedure From inside the fender, release the lower retainer of the charge port housing. |
| 2 | Charge Port Upper Housing Retainer Procedure Using a flat-bladed tool that fits into the 2 depressions, break through the 2 depressions with light pressure and then pry the retainer free to release the charge port housing from the fender. |
| 3 | Charge Port Housing Assembly Procedure
|