lemon-mirror:
Home >> Daihatsu >> 1992 >> Charade SX >> Repair and Diagnosis >> Engine Performance >> Sensor Range Charts >> Engine Controls - Sensor Operating Range Charts >> Introduction

Engine Controls - Sensor Operating Range Charts: Introduction

Sensor operating range information can help determine if a sensor is out of calibration. An out-of-calibration sensor may not set a trouble code, but it may cause driveability problems.

Where necessary, see SYSTEM/COMPONENT TESTS article in the ENGINE PERFORMANCE Section for terminal identification.

NOTE: Unless stated otherwise in test procedure, perform all voltage tests should using a Digital Volt-Ohmmeter (DVOM) with a minimum 10-megohm input impedance.
COLD START INJECTOR TIME SWITCH SPECIFICATIONS

Switch Terminals Ohms
Coolant Temperature Below 68°F (20°C)
1 & 2 33-41
1 & 3 33-41
2 & 3 0
Coolant Temperature Above 75°F (24°C)
1 & 2 67-79
1 & 3 67-79
2 & 3 40-155
AIR & COOLANT TEMPERATURE SENSOR SPECIFICATIONS

Temperature (1) Ohms
176°F (80°C) 222-422
140°F (60°C) 384-784
104°F (40°C) 840-1440
68°F (20°C) 1950-2950
32°F (0°C) 4380-7380
-4°F (-20°C) 13,000-19,400
(1) Specifications are for intake air and cooling system fluid.
FUEL PUMP RELAY SPECIFICATIONS (1.0L & 1.6L)

Terminals Specification
No. 1 & 2 (1) Continuity
No. 3 & 4 No Continuity
No. 1 & 3 No Continuity
No. 1 & 4 No Continuity
No. 2 & 3 No Continuity
No. 2 & 4 No Continuity
Function Test No. 3 & 4 (2) Continuity
(1) Resistance specification is 40-100 ohms.
(2) Test with battery voltage applied to terminals No. 1 and 2.
FUEL PUMP RELAY SPECIFICATIONS (1.3L)

Terminals Specification
No. 1 & 2 10-40 Ohms
No. 1 & 3 No Continuity
No. 1 & 4 No Continuity
No. 1 & 5 No Continuity
No. 2 & 5 No Continuity
No. 3 & 5 100-200 Ohms
No. 4 & 5 No Continuity
Function Test No. 4 & 5 (1) Continuity
Voltage Test No. 4 (2) Battery Voltage
(1) Test with battery voltage applied to terminals No. 1 and 2.
(2) Test with battery voltage applied to terminals No. 3 and 5.
INJECTOR & MAIN RELAY SPECIFICATIONS

Terminals Specification
Step 1, Resistance Test Injector & Main Relay No. 1 & 2 40-100 Ohms
Step 2, Continuity Test Injector & Main Relay
No. 1 & 3 No Continuity
No. 1 & 4 No Continuity
No. 2 & 3 No Continuity
No. 2 & 4 No Continuity
No. 3 & 4 No Continuity
No. 3 & 4 (1) Continuity
(1) Test with battery voltage applied to terminals No. 1 and 2.
OXYGEN SENSOR VOLTAGE TEST (1)

Condition Volts
Lean .1
Rich .45 or more
(1) Measure voltage between O2 sensor terminals No. 1 and 2.
PRESSURE SENSOR PIN CHECK

Engine Sub-Harness Terminals
1.0L
1st Check No. 9&29
2nd Check (1) No. 31&29
3rd Check No. 9&29
1.3L&1.6L
1st Check No. 6&39
2nd Check (1) No. 5&36
3rd Check No. 6&39
(1) Measured voltage should be 4.5-5.5 volts. If 2nd check is within specification, but 1st check is not, replace pressure sensor.
PRESSURE SENSOR SPECIFIED VALUE (1.0L)

Altitude: Ft. (m) Atmos. Pressure: In. Hg Voltage
0 (0) 29.92 2.1-2.7
1640 (500) 28.19 1.9-2.5
3280 (1000) 26.54 1.8-2.4
PRESSURE SENSOR SPECIFIED VALUE (1.3L & 1.6L)

Altitude: Ft. (m) Atmos. Pressure: In. Hg Voltage
0 (0) 29.92 3.2-4.0
1640 (500) 28.19 3.1-3.8
3280 (1000) 26.54 3.0-3.6
THROTTLE POSITION SENSOR RESISTANCE SPECIFICATIONS

TPS Terminals Ohms
Charade 1.0L - Throttle Fully Closed
No. 29 & 31 4250-8250
No. 30 & 31 3500-10,300
No. 29 & 32 Less Than 350
Charade 1.0L - Throttle Fully Open
No. 30 & 31 300-6300
No. 29 & 32 (Open More Than 1.5 Degrees) Infinity
Charade 1.3L (A/T) - Throttle Fully Closed
No. 12 & 21 Less Than 29,000
No. 32 & 21 Less Than 29,000
Charade 1.3L (A/T) - Throttle Fully Open
No. 12 & 21 Infinity
No. 32 & 21 Infinity
Charade 1.3L (M/T) & Rocky 1.6L - Throttle Fully Closed
No. 12 & 29 Less Than 29,000
No. 32 & 29 Infinity
Charade 1.3L (M/T) & Rocky 1.6L - Throttle Fully Open
No. 12 & 29 Infinity
No. 32 & 29 Less Than 29,000