Preliminary Checks
Most driveability problems in the multi-point EFI system result from faulty wiring or loose and/or leaking hose connections. To avoid unnecessary component testing, visual check should be performed before beginning trouble shooting procedures. Preliminary visual check should include:
- Air ducts at air cleaner, turbocharger and throttle body.
- All electrical connections at components.
Check vacuum lines for tight, leak-free connections in these areas:
- Throttle body.
- Solenoid bank.
- Vapor canister.
- PCV valve to turbocharger vacuum port.
- Backpressure transducer.
- MAP sensor.
Ensure that following electrical connectors are properly attached:
- Two 25-way connectors (Red and Blue) at logic module.
- One and 3-way connectors at ASD relay.
- 12-way (White) and 10-way (Black) power module connectors.
- Four and one-way connectors at solenoid bank.
- 2-way speed sensor connector (in-line with speedometer cable).
- 2-way charge temperature sensor connector.
- 6-way throttle body connector.
- Four 2-way fuel injector connectors.
- O2 sensor connector.
- 2-way coolant temperature sensor connector.
- Two 3-way connectors (Gray and Black) at distributor.
- 1-way connector at detonation (knock) sensor.
- Two 3-way radiator fan relay connectors.
- Ground eyelet mounting onto intake manifold.