Pump, Water: Installation: 2.8L
Courtesy of CHRYSLER GROUP, LLC
- Clean gasket mating surfaces as necessary.
- Place water pump (2) and gasket in place. Install water pump retaining bolts (1). Torque bolts to 32 N.m. (24 ft. lbs.).
- Install both inner and outer timing belt covers. Refer to COVER(S), ENGINE TIMING, INSTALLATION
.
- Evacuate air and refill cooling system. Refer to PUMP, WATER, STANDARD PROCEDURE .
- Connect negative battery cable.
- Check cooling system for leaks. Refer to DIAGNOSIS AND TESTING .