lemon-mirror:
Home >> Dodge and Ram >> 2022 >> ProMaster 1500 >> Repair and Diagnosis >> Electrical >> Body Electrical >> Power Distribution >> Module, Wireless Charging Pad >> Installation

Module, Wireless Charging Pad: Installation

GC0204091Courtesy of CHRYSLER GROUP, LLC
  1. Position the wireless charging pad module (3) to the back side of the instrument panel cupholder (1).
  2. Install the fasteners (2) and tighten securely.
  3. Install the instrument panel cupholder. Refer to CUPHOLDER, INSTRUMENT PANEL, INSTALLATION .
  4. Connect the negative battery cable. If equipped with an Intelligent Battery Sensor (IBS), connect the IBS connector.