Inhibitor Solenoid Removal/Installation
- Disconnect the inhibitor solenoid 2P connector (A) and the ground terminal (B).
- Remove the inhibitor solenoid (C), then remove the two O-rings (D) from the inhibitor solenoid.
- Install the O-rings on the inhibitor solenoid, then install the inhibitor solenoid and the ground terminal.
- Check the connector for corrosion or dirt, and clean or repair if necessary.
- Connect the inhibitor solenoid 2P connector.