lemon-mirror:
Home >> Infiniti >> 2003 >> FX35 RWD >> Repair and Diagnosis >> Body & Frame >> Windows >> Power Window System >> Power Window System >> Consult-II Inspection Procedure >> Work Support

Work Support

WORK SUPPORT DESCRIPTION

Work item Description
RETAINED PWR Rap signal's power supply period can be changed by mode setting. Selects rap signal's power supply period between three steps
  • MODE1 (45 sec.) / MODE2 (OFF) / MODE 3 (2 min.).