lemon-mirror:
Home >> Infiniti >> 2005 >> QX56 RWD >> Repair and Diagnosis >> Engine Performance >> Engine Control System >> DTC P1706: PNP Switch >> Overall Function Check >> With GST

With GST

  1. Turn ignition switch ON.
  2. Check voltage between ECM terminal 102 (PNP switch signal) and ground under the following conditions.
    PNP SWITCH CONDITION - VOLTAGE

    Condition (Gear position) Voltage V (Known-good data)
    P or N position Approx. 0
    Except the above position BATTERY VOLTAGE (11 - 14V)
  3. If NG, go to "DIAGNOSTIC PROCEDURE ".
    Fig 1: Checking Voltage Between ECM Terminal 102 (PNP Switch Signal) & Ground
    G02389330Courtesy of NISSAN MOTOR CO., U.S.A.