Hold-In Coil Test
- Connect a jumper wire between the "M" (MT) terminal and solenoid case. Apply 8 volts to "S" terminal to pull in the plunger. See Fig 1. Disconnect lead to "M" (MT) terminal.
- If pinion remains out (plunger is pulled-in), hold-in coil is good. If not, replace magnetic switch.