Installation Procedure
- Connect the PCM electrical connectors.
- Tighten the PCM electrical connector bolts.
Tighten: Tighten the bolts to 8 N.m (71 lb in).
- Install the PCM.
- Ensure that the PCM mounting tabs are engaged.
- Secure the spring latch to the PCM.
- Install the PCM cover and cover retainers if previously removed.
- Connect the negative battery cable. Refer to Battery Negative Cable Disconnect/Connect Procedure in Engine Electrical.
- If the PCM was replaced, the replacement PCM must be programmed. Refer to Service Programming System (SPS) in Programming.
NOTE:
Refer to Fastener Notice
in Cautions and Notices.