lemon-mirror:
Home >> Jaguar >> 2008 >> XKR 2D Convertible >> Repair and Diagnosis >> Engine Performance >> Fuel Delivery >> Acceleration Control >> Acceleration Control >> Acceleration Control - Description & Operation >> Introduction

Acceleration Control - Description & Operation: Introduction

Acceleration control for the 4.2 Liter engine is achieved via an electronic throttle drive by wire system. The throttle is electronically connected to the ECM and the ECM then controls the fueling for the relevant throttle demand signal from the APP sensor.