Charging System (Service Information): Generator: Installation: 2.0L
- Position the generator for installation.
- Install the two bolts to the generator and tighten to the proper torque specifications. Refer to TORQUE SPECIFICATIONS .
- Connect the generator field connector and position the B+ cable to the generator stud.
- Install the B+ nut and tighten to the proper torque specifications. Refer to TORQUE SPECIFICATIONS .
- Install the serpentine belt. Refer to INSTALLATION .
- Install the right halfshaft. Refer to INSTALLATION .
- If equipped, install the Power Transfer Unit (PTU). Refer to INSTALLATION .
- Install the belly pan. Refer to BELLY PAN, INSTALLATION .
- Remove the support and lower the vehicle.
- Connect the negative battery cable(s). Refer to NEGATIVE CABLE .