lemon-mirror:
Home >> Kia >> 2016 >> Forte EX >> Repair and Diagnosis >> Engine Performance >> Fuel Delivery >> Fuel Delivery System - 2.0L >> Filler-Neck Assembly >> Repair Procedures >> Installation

Repair Procedures: Installation

  1. Install in the reverse order of removal.

    Filler-Neck Assembly Bracket Installation Bolt: 

    7.8 ~ 11.8 N.m (0.8 ~ 1.2 kgf.m, 5.8 ~ 8.7 lb-ft)