Throttle Body: Removal
- REMOVE ENGINE UNDER COVER LH
- REMOVE ENGINE UNDER COVER RH
- DRAIN ENGINE COOLANT (See Drain or Add coolant under ON-VEHICLE INSPECTION )
- REMOVE COOL AIR INTAKE DUCT SEAL (See REMOVAL )
- REMOVE ENGINE ROOM SIDE COVER LH (See REMOVAL )
- REMOVE V-BANK COVER SUB-ASSEMBLY (See REMOVAL )
- REMOVE AIR CLEANER INLET ASSEMBLY (See REMOVAL )
- REMOVE AIR CLEANER CAP SUB-ASSEMBLY
- Disconnect the 2 vacuum hoses.
- Disconnect the mass air flow meter connector (*1).
- Disconnect the No. 2 ventilation hose (*2).
- Disconnect the hose band (*3).
- Disconnect the 3 bands, and remove the air cleaner cap sub-assembly.
- REMOVE AIR CLEANER CASE SUB-ASSEMBLY (See REMOVAL )
- REMOVE NO. 1 AIR CLEANER INLET (See REMOVAL )
- REMOVE THROTTLE BODY
- Disconnect the throttle body connector and clamp.
- Disconnect the 2 water by-pass hoses from the throttle body.
- Remove the 4 bolts and throttle body.
- Remove the throttle body gasket from the intake air surge tank.