lemon-mirror:
Home >> Mazda >> 2002 >> MPV ES >> Repair and Diagnosis >> Engine Mechanical >> Mechanical >> Engine - Intake-Air Systems >> Intake-Air System Removal/Installation >> Intake Manifold Installation Note

Intake Manifold Installation Note

  1. Tighten the intake manifold installation bolts in the order indicated.

    Tightening Torque 

    1. 8-12 N.m {82-122 kgf.cm, 72-105 in.lbf} 

    Fig 1: Intake Manifold Bolt Tightening Sequence
    G01197303Courtesy of MAZDA MOTORS CORP.