Continuity Inspection
- Remove the neutral switch. (See NEUTRAL SWITCH REMOVAL/INSTALLATION ).
- Verify that the continuity between neutral switch terminals A and B is as indicated in the table.
- If it can be verified, perform the Circuit Open/Short Inspection .
- If it cannot be verified, replace the neutral switch.
MEASURED CONDITION AND CONTINUITY
| Measured condition | Continuity |
|---|---|
| Rod pushed | Continuity detected |
| Except above | No continuity |