lemon-mirror
:
Home
>>
Nissan-Datsun
>>
2012
>>
Versa SV
>>
Repair and Diagnosis
>>
Engine Performance
>>
System
>>
Engine Control System - Component Testing (Sedan)
>>
Periodic Maintenance
>>
Ignition Timing
>>
Inspection
Ignition Timing: Inspection
CHECK IGNITION TIMING
Attach timing light (A) to loop wire (1) as shown below.
Fig 1: Identifying Timing Light And Loop Wire
Courtesy of NISSAN NORTH AMERICA, INC.
Check ignition timing.
: INSPECTION END
Fig 2: Identifying Ignition Timing And Timing Indicator
Courtesy of NISSAN NORTH AMERICA, INC.