Installation Procedure
- Install the automatic shift lock actuator to the base of the shift lock control and the pivot point (1).
- Connect the automatic shift lock actuator electrical connector.
- Install the center console. Refer to Front Floor Console Replacement .
- Connect the negative battery cable. Refer to Battery Negative Cable Disconnection and Connection (RPO LS4) or Battery Negative Cable Disconnection and Connection (RPOs L26/L32) in Engine Electrical.