Installation Procedure
- Position the shifter on the studs and install the front 2 nuts (2).
- Install the 2 rear nuts (3).
Tighten: Tighten the nuts to 25 N.m (18 lb ft).
- Install the shift cables. Refer to Shift Control Cable Replacement .
- Install the console. Refer to Console Replacement - Front Floor in Instrument Panel, Gages, and Console.
NOTE:
Refer to Fastener Notice
in Cautions and Notices.